The study reveals regulatory gaps and divergent state approaches to environmental licensing of hyperscale data centers in Brazil, highlighting the need for national guidelines.
The development of artificial intelligence is driving the expansion of data centers worldwide. Countries with a significant number of hyperscale data centers have reported negative environmental and social impacts, as well as growing opposition from local communities. More recently, growing demand has driven the expansion of these projects into the Global South, including Brazil and Chile. As this is a relatively new project typology in these countries, its arrival has prompted debates on the need for sector-specific regulation and appropriate environmental impact assessment (EIA) and licensing procedures. This paper examines the first hyperscale data center projects proposed in Brazil, investigating whether EIA or environmental licensing is required and, where applicable, the characteristics of the assessment systems, including screening criteria, required environmental studies, and public participation requirements. We conducted a document analysis of publicly available project documents and regulatory instruments. Results show that none of the states initially included data centers in their environmental regulations, leading to different regulatory approaches to deal with the new projects. Although states are moving towards developing specific licensing frameworks for data centers, in the absence of national guidelines, substantial differences remain in screening criteria and in the level of simplification of licensing procedures and environmental assessment requirements across states.
Environmental Engineer with a PhD in Environmental Sciences. Professor at the Federal University of Uberlândia, Brazil, specializing in EIA and SEA. Vice-President of the Brazilian Association for IA.