Lifecycle impact assessment in hydropower projects is crucial to completely account for cumulative impacts while making suppliers and players in the value chain accountable to ensure sustainability.
A lifecycle perspective in a hydropower projects has become imparative in modern impact assessment to evaluate the dam and power station's total impact and footprint from birth through retirement.
This starts from the planning, siting & design to etablish long-term ecological and social disruption.
Early Life Cycle Assessment (LCA) is a crucial tool at this stage. Greenfield and brownfield options analysis is key at this stage. It is key to account for climate change impacts on water flow of the the liefespan (odten 60 to over 100 years).
The construction and assembly presents the Carbon & Material Peak (highest environmental and carbon footprint) due to heavy machinery, transportation, and massive consumption of raw materials including concrete and steel, local topsoil disruption, riverbeds disruption, and nearby habitats alteration. The paper exploles the embodied carbon and material supply chains including those spanning international borders, rather than just local impact.
The operation and maintenance of hydropower projects present a long tail. The impact assessment at this stage focuses on generation of clean, flexible elctricity while ssustainably managing water resources. Submerged organic matter present a source of carbon.
Decommissioning, repurposing and "afterlives" are key aspects of attention in impact assessmnet from a lifecycle perspective. Handling aging, silted-up dams should be mainstremed. The lifecycle view should focus on full or partial dam removal and river restoration, reservoir sediment management and repurposing infrastructure.
Phillip Ziduche is a sustainability specialist with a strong Environmental and Safety background spanning 18 years post qualification in Mining, Enegry and Hydropower projects.