Problem: risk quantification/right timing are not integrated in IA. Outcome: unpredictable impacts, unenforceability and misattribution of responsibility. The way out: small strategic steps.
When risk quantification and right timing are not effectively integrated within the IA process, and within the system over a project’s lifecycle, the affected parties and proponents bear the result. This is especially concerning if compressing and fast-tracking decisions miss or dilute the risk quantification needed at the right time. This is the blind spot. And the fall-out litigation is not addressing the problem.
Even with proper scoping of the project and IA, the IA’s purpose can fall flat at critical lifecycle junctures - e.g. unreliable or missing impact quantification (which is a form of risk quantification) compromises practical and relevant permitting, enforceability and the ability to attribute responsibility over the lifecycle. This applies to regulatory processes for IA, regional or strategic impact assessments alike. These factors inform whether IA becomes performative and whether IA serves its intended purpose throughout and at the end of a project.
Addressing the blind spot leads to legislative reform but it is not a prerequisite. Even at a party level, being able to strategically understand and capture these issues can drive effective IA submissions and analysis. This makes the project lifecycle and IA alignment more predictable and more likely for projects to deliver societal benefits versus costs, exposure, litigation. The takeaway: clearer perception of effective risk/timing factors strengthens your IA outputs, benefiting you and serving to better clarify the reform needed.
Carla Conkin is a natural resource lawyer, appointed as a Review Panel Member (roster) with the Impact Assessment Agency of Canada. She is a regulatory strategist with a systems reform focus.