This case study examines the socioeconomic drivers and impacts of encroachment on one of Nigeria’s transmission Row, drawing lessons to anticipate future risks and strengthen sustainable Row managemen
TRANSMISSION CORRIDOR ENCROACHMENT: SOCIO ECONOMIC DRIVERS AND LESSONS
Abstract
The unauthorized occupation of high-voltage transmission line Rights-of-Way (ROW) presents an increasing threat to public safety, risk of catastrophic power disruptions, constrain infrastructure maintenance, and create environmental and socioeconomic pressures. This paper examines the underlying socioeconomic drivers and impacts of encroachment in Nigeria using the 82.8-km Katampe–Shiroro 330-kV transmission line corridor as a case study, it investigates how factors such as settlement growth, land access, livelihood needs, fragmented regulatory oversight, and awareness of corridor restrictions shape land use within the right-of-way. It also considers consequences for affected communities, environmental management, and the safe and reliable operation of transmission infrastructure. By connecting the drivers of encroachment with its observed patterns and impacts, the study draws lessons for identifying areas at risk and anticipating future effects along comparable corridors. It highlights the value of integrating community perspectives, integrated land-use planning, community safety education, routine monitoring, appropriate enforcement and equitable resettlement policies that align grid reliability with local socio-economic realities into corridor management. The findings will present more proactive environmental and social assessment, helping decision-makers address the conditions that contribute to encroachment while improving the management of existing and planned transmission corridors.
I’m an environment manager examining the socioeconomic drivers and impacts of encroachment on Nigeria’s power transmission corridors, focusing on sustainable environmental management and future risk.