Complaints handling lessons from Power transmission line development

Abstract ID: 2614
Status: Approved
Session: #168 — Beyond Complaint Handling: Tools for Adaptive Social Performance Management

Summary Statement

The discussion will examine the types of grievances predicted at ESIA stage, recorded during project implementation and their immediate and underlying causes.

Abstract

Power transmission line construction projects generate a range of environmental and social impacts that extend beyond land acquisition and compensation. While project grievance mechanisms are designed to provide affected parties with channels to raise concerns and seek redress, grievances arising during project planning, design and construction often reveal broader weaknesses in project planning, environmental and social management plan implementation, and project supervision. Drawing on practical experience in environmental and social risk management, project implementation and construction supervision across transmission line projects within Sub Saharan Africa, this presentation will examine how grievances can provide valuable evidence of gaps between anticipated project impacts, environmental and social commitments, and actual implementation practices. The discussion will look at anticipated impacts at project inception and explore a range of grievances encountered during transmission line construction, including disputed land acquisition and compensation, disturbance of culturally sensitive sites or activities, encroachment beyond approved project servitude, nuisance from temporary construction, and community health and safety incidents. We will through case studies; explore how seemingly isolated complaints may reveal systemic failures in planning, risk controls and environmental and social governance.

Presenting Author Bio

Sheba is an Environmental and Social Specialist with 18 years of experience in environmental consulting across Africa including 9 years with electricity transmission infrastructure development

Presenting Author

Sheba Ndagire
THOM Consult Limited