Industrial contamination in Pilar, Argentina, informs proposed EIA criteria for waste management, exposure pathways and closure planning to protect surrounding ecosystems.
An assessment of management effectiveness at the Reserva Natural del Pilar, in Argentina's lower Luján River basin, included a territorial assessment of environmental pressures and legacy pollution. This contribution draws on that assessment and studies of contamination associated with the former Anilinas Argentinas factory. Available studies document heavy metal contamination in soils and accumulation in riparian woodland vegetation after industrial operations ceased. The study aims to identify what environmental impact assessment (EIA) should address to prevent industrial projects from leaving lasting pollution in surrounding ecosystems. The territorial assessment and contamination studies will be reviewed to link documented effects and potential risks to three issues: waste and effluent generation and disposal; contaminant dispersal and exposure pathways; and closure planning and post-closure monitoring. The resulting criteria will be compared with applicable EIA requirements in Buenos Aires Province. The expected contribution is a set of criteria specifying the information and preventive measures needed from project design to address pollution and its persistence after closure. The case seeks to inform the assessment of future industrial projects and strengthen the long-term protection of conservation areas.
Environmental scientist, Dean of UNPilar's Faculty of Production and Technology and FAUBA lecturer in Argentina. Specialist in environmental impact assessment and environmental management. Argentina